Employer payroll cost
Payroll taxes, workers compensation and labor-linked insurance should be visible instead of hidden in one vague overhead bucket.
Labor rate guide
A labor rate is not just wage. Contractors need to account for payroll taxes, workers compensation, benefits, paid time off, utilization and markup before labor can be priced honestly in a bid, estimate or change order.
Construction labor burden is the total cost layered on top of wage before labor becomes a real sellable rate. At minimum that usually includes employer payroll taxes, workers compensation, insurance-related adders, benefits and paid time off. In many companies it also includes recurring labor-linked items such as training, uniforms or small tools, depending on how overhead is structured.
The point is simple: if a field employee earns $30 per hour, the company does not recover labor correctly by charging only $30 per hour in an estimate.
| Step | Formula idea | What it answers |
|---|---|---|
| 1. Percentage burden | Base wage × total burden percentage | How much tax, comp, insurance, PTO and other burden add on top of wage. |
| 2. Loaded labor cost | Base wage + percentage burden + hourly benefits | What one paid hour really costs the company. |
| 3. Cost per billable hour | Loaded labor cost ÷ billable utilization | What one productive hour must recover after downtime and non-billable time. |
| 4. Billable labor rate | Cost per billable hour + markup | The selling rate that can go into an estimate or change order. |
Many estimators remember taxes and workers comp but still miss utilization. A paid hour is not always a billable project hour. Travel, loading, meetings, rain delay, cleanup, supervision overlap and shop time still exist. If loaded labor cost is spread only across perfect production hours, the bid quietly under-recovers payroll.
This is why a contractor can have a labor rate that looks profitable on paper and still lose margin in the field.
| Input | Example value | Comment |
|---|---|---|
| Base wage | $30.00/hr | Visible hourly wage only. |
| Payroll taxes | 9% | Employer-side payroll burden. |
| Workers comp | 7% | Trade and state class can move this sharply. |
| Insurance and other burden | 5% | Liability-related adders and company-specific labor burden. |
| Benefits | $4.00/hr | Use hourly equivalent if benefits are not percentage-based. |
| Paid time off | 8% | Often forgotten if only direct payroll lines are reviewed. |
| Billable utilization | 85% | Admits that not every paid hour is recoverable on jobs. |
| Markup | 25% | Used only after cost recovery is believable. |
With those assumptions, loaded labor cost lands far above wage. Once utilization is applied, the required recovery per productive hour climbs again. Only then does markup belong in the sequence.
Payroll taxes, workers compensation and labor-linked insurance should be visible instead of hidden in one vague overhead bucket.
Health, retirement, paid time off or recurring employer obligations belong in the labor model if labor has to recover them.
This is the realism check. If utilization is too optimistic, labor rates will still look clean while staying too low.
Markup should be deliberate and separate from the burden build-up. Cost recovery first, commercial pricing second.
Not every company uses the same structure. Some contractors keep supervision, small tools, shop overhead, vehicles or general conditions outside the labor burden formula and recover them elsewhere in the estimate. That is fine, as long as the logic is consistent. The mistake is not where you place the item. The mistake is pricing labor as if the item does not exist at all.
There is no universal number. The right answer depends on local payroll rules, workers compensation class, benefits, insurance and how much of paid time is truly billable. That is exactly why a generic wage-based assumption is dangerous.
No. Burden is cost. Profit belongs in markup or margin analysis after the loaded labor cost and utilization math are already understood.
The guide explains the sequence, but a calculator makes it easier to test different assumptions quickly. The best setup is to use both: the guide for logic and the calculator for working numbers.
Use the calculator when you want to plug in wage, burden and utilization right now.
Open the labor burden calculatorMove from cost recovery to selling price with the markup and margin calculator.
Use the markup calculatorSee the starter pack if you want labor, equipment, markup and review logic in one workbook.
See the starter pack